Tuesday, October 20, 2009

Bathroom update



The bathroom addition project in our basement is chugging right along. I've got the walls roughed in, as well as the new circuit and electrical fixtures and most of the plumbing. The shower floor pan is in. Two more water supply lines to run, then it will be time for the rough inspection, after which I can lay the tile floor and start buttoning up the walls. We still need to purchase tile, vanity, toilet, door, shower door and wall paint. It is slow going, steady but sure!

Fall Weekend Family Fun



We had a wonderful weekend visiting with Pam and Doug. They are on the return leg of their six month trip to the eastern most point on the continent, having left home (western Washington) mid-June. Airstream trailer in tow, they will have logged nearly 15,000 miles when they arrive back home.

Weather cleared enough for a nice country walk with Haley at Squire Valleevue. The leaves were gorgeous and dog and kids enjoyed being out!