The bathroom addition project in our basement is chugging right along. I've got the walls roughed in, as well as the new circuit and electrical fixtures and most of the plumbing. The shower floor pan is in. Two more water supply lines to run, then it will be time for the rough inspection, after which I can lay the tile floor and start buttoning up the walls. We still need to purchase tile, vanity, toilet, door, shower door and wall paint. It is slow going, steady but sure!
No comments:
Post a Comment