Monday, November 9, 2009

Bathroom tile



I spent Saturday evening laying the tile in the new bathroom and it went pretty well. I arranged them such that cutting would be at a minimum. Grout will follow in the next day or two now that the thinset mortar has cured.

Sunday I began putting up the drywall, starting with the outside walls. Once the grout is done on the tiles, I'll do the ceiling in the room, then the walls. So this should be the last time the framing is visible!

No comments: